As water in the Cedar River reaches historical levels it is has come to the level of the doors of the water system pump house at the south end of the Edgewood Road bridge. At about 4 o'clock today City workers have hauled in trucks and trailer loads of sand bags and are placing the sand bags to protect it.
Edgewood Road Pump House
This story is inappropriate and should be flagged for moderation. Please choose from one of the following options:
